Using Elastic Time to cut ADR?
I was never interested in version 7.4 untill it occured to me that it might be possible to edit ADR using "Elastic Time". I put out the question before I dive into another upgrade (that may or may not turn my system into a crashing wreak!)
Would it be possible making ADR fit using Elastic Time?
Has anyone tried it?
Cheers!
|