Re: Managing Signal Level through SC48/System Controller/Amps
Thanks Guys.
I am using RMS ballistics for metering
My "Input Clip Margin Below Max" & "Output Clip Margin Below Max" are both set to 6dB. Does this mean the Venue indicates clipping 6dB before it actually is clipping. and would I be better using peak monitoring?
|