Update Pt 6.0.1 to 6.9
I have a Pro Tools|HD 2 Accel System with PT 6.0.1 running on a Dual G4 with OS X 10.2.6.
Now I want to switch to Tiger and to Pro Tools 6.9.2. How do I do that?
I install Tiger, then 6.0.1, then 6.4 and then upgrade to 6.9.2? Would that be possible?
Thanks,
Tobias
|